Project for the Maintenance of School Bathrooms and Desks
The project was implemented between 01/07/2021 and 20/11/2021. During the project, 14-bathroom blocks were rehabilitated across 10 schools, and 12,596 school desks were maintained.
The number of students benefiting from this project was 42,045 in the western, eastern, and northern countryside of Deir ez-Zor.
The work included installing new wooden doors and frames for all rooms, iron doors for the blocks from the outside, and 2,000-liter water tanks. Additionally, damaged tiles were removed and replaced with new ones, the sewage system was rehabilitated, the drinking water network was repaired, faucets were installed, and interior and exterior painting was done, including painting all doors and insulating the roof. A water line was also extended to the blocks and connected to the public water network. The maintenance of school desks was carried out in all schools within the Jazrat, Kasrah, and Sour educational complexes, as well as some schools in the Busayra educational district.
- YEAR 01/07/2021
- WE DID Project for the Maintenance of School Bathrooms and Desks
- Atthe western, eastern, and northern countryside of Deir ez-Zor.
- CATEGORY and Psychological Support
- TAGS