The project was implemented between 05/08/2020 and 20/11/2020. It involved extending and operating drip irrigation systems for 36 fruit tree farmers in the Al-Shafaa area. The project covered an area of 305.5 dunams and 18,219 fruit trees.
The project included the construction of a cement water basin and the installation of a drip irrigation network with a filter, fertilizer injector, and water pump. Additionally, 36 packages were distributed containing fertilizers, insecticides, and farming equipment, which included balanced fertilizer, foliar fertilizer, insecticide, a motorized backpack sprayer, rain boots, gloves, safety glasses, tree pruning shears, a saw, and a toolkit for network maintenance and installation.