Bedayasyria

  • Homepages
  • About Us
  • Our Projects
    • Education, Protection, and Psychological Support
    • Agricultural Sector
    • Infrastructure Rehabilitation and Debris Removal
    • Livelihoods and Stability Support
    • Community Security and Peace
  • Contact Us
  • arArabic
  • Home
  • Infrastructure Rehabilitation and Debris Removal
  • Archive from category "Infrastructure Rehabilitation and Debris Removal"
July 20, 2025

Category: Infrastructure Rehabilitation and Debris Removal

Abu Al-Hassan Water Network Rehabilitation

Friday, 06 September 2024 by hanialshwikh@gmail.com

The project was implemented between 01/01/2023 and 15/02/2023.
The project benefited 4,500 people.
It involved the installation of polyethylene pipes suitable for drinking water, with a diameter of 6 inches and a length of 2,050 meters, and a diameter of 2.5 inches and a length of 1,250 meters. The project also included the installation of valves with different diameters (8 inches, 6 inches, 4 inches, 3 inches, and 2.5 inches) to control water flow in the pipes.

Read more
  • Published in Infrastructure Rehabilitation and Debris Removal
No Comments

Debris Removal Project in the Western and Eastern Countryside of Deir ez-Zor:

Friday, 06 September 2024 by hanialshwikh@gmail.com

The project was implemented from 15/08/2019 to 13/12/2019.
It involved removing rubble and debris from the walls of 32 schools and cleaning the sites, as well as removing 5 destroyed water tanks. The debris was transported and used to fill potholes, with a total of 4,500 cubic meters of debris removed and approximately 35,850 kilograms of iron extracted.

Read more
  • Published in Infrastructure Rehabilitation and Debris Removal
No Comments

Debris Removal in the Eastern Countryside of Deir ez-Zor

Friday, 06 September 2024 by hanialshwikh@gmail.com

The project was implemented from 01/08/2018 to 20/10/2018.
The project directly benefited 1,700 people.
The project involved demolishing and removing debris from buildings that were at risk of collapse and damaged due to the war in the eastern countryside of Deir ez-Zor, specifically in the areas of Al-Shuhail, Al-Hawaij, Darnaj, Al-Zer, Al-Attal, Thiban, and Al-Takihi.

Project activities included:

  • The removal of 61 buildings.
  • The area of the demolished buildings was 5,526 square meters, and the volume of debris removed was 8,250 cubic meters.
  • A total of 51 murals were completed, featuring messages on topics such as “environmental conservation, promoting cleanliness, water conservation, children’s rights, peace advocacy, and natural landscapes.” An accompanying activity involved painting walls and curbs in the main roundabouts of some targeted areas.
  • The total area of the murals was 679 square meters, while the area of walls and curbs painted was 3,012 square meters.
  • Filling potholes and cleaning roads surrounding work sites, as well as main roads and roundabouts, covering an area of 6,215 square meters.
Read more
  • Published in Infrastructure Rehabilitation and Debris Removal
No Comments

Recent Posts

  • Taziz Initiative (Euphrates Dialogues)
  • Our Security Project
  • Project for Enhancing Marketing Skills and Improving Service Delivery through Vocational Training in Hajin
  • Youth Center Project in Hajin City
  • Project to Support Displaced Persons through Vocational Training in Abu Khashab Camp

Recent Comments

No comments to show.

Archives

  • September 2024
  • August 2024
  • August 2015

Categories

  • Agricultural Sector
  • Community Security and Peace
  • Education, Protection, and Psychological Support
  • Infrastructure Rehabilitation and Debris Removal
  • Livelihoods and Stability Support
  • Uncategorized

Featured Posts

  • Taziz Initiative (Euphrates Dialogues)

    0 comments
  • Our Security Project

    0 comments
  • Project for Enhancing Marketing Skills and Improving Service Delivery through Vocational Training in Hajin

    0 comments
  • Youth Center Project in Hajin City

    0 comments
  • Project to Support Displaced Persons through Vocational Training in Abu Khashab Camp

    0 comments

Recent Comments

    Archives

    • September 2024
    • August 2024
    • August 2015

    Categories

    • Agricultural Sector
    • Community Security and Peace
    • Education, Protection, and Psychological Support
    • Infrastructure Rehabilitation and Debris Removal
    • Livelihoods and Stability Support
    • Uncategorized

    Useful Links

    • Homepages
    • About Us
    • Contact Us
    • arArabic

    GET IN TOUCH


    Email: info@bedayasyria.org

    • Homepages
    • About Us
    • Contact Us
    • arArabic

    © 2024 All rights reserved.

    TOP