Abu Al-Hassan Water Network Rehabilitation
The project was implemented between 01/01/2023 and 15/02/2023.
The project benefited 4,500 people.
It involved the installation of polyethylene pipes suitable for drinking water, with a diameter of 6 inches and a length of 2,050 meters, and a diameter of 2.5 inches and a length of 1,250 meters. The project also included the installation of valves with different diameters (8 inches, 6 inches, 4 inches, 3 inches, and 2.5 inches) to control water flow in the pipes.
- Published in Infrastructure Rehabilitation and Debris Removal
Debris Removal Project in the Western and Eastern Countryside of Deir ez-Zor:
The project was implemented from 15/08/2019 to 13/12/2019.
It involved removing rubble and debris from the walls of 32 schools and cleaning the sites, as well as removing 5 destroyed water tanks. The debris was transported and used to fill potholes, with a total of 4,500 cubic meters of debris removed and approximately 35,850 kilograms of iron extracted.
- Published in Infrastructure Rehabilitation and Debris Removal
Debris Removal in the Eastern Countryside of Deir ez-Zor
The project was implemented from 01/08/2018 to 20/10/2018.
The project directly benefited 1,700 people.
The project involved demolishing and removing debris from buildings that were at risk of collapse and damaged due to the war in the eastern countryside of Deir ez-Zor, specifically in the areas of Al-Shuhail, Al-Hawaij, Darnaj, Al-Zer, Al-Attal, Thiban, and Al-Takihi.
Project activities included:
- The removal of 61 buildings.
- The area of the demolished buildings was 5,526 square meters, and the volume of debris removed was 8,250 cubic meters.
- A total of 51 murals were completed, featuring messages on topics such as “environmental conservation, promoting cleanliness, water conservation, children’s rights, peace advocacy, and natural landscapes.” An accompanying activity involved painting walls and curbs in the main roundabouts of some targeted areas.
- The total area of the murals was 679 square meters, while the area of walls and curbs painted was 3,012 square meters.
- Filling potholes and cleaning roads surrounding work sites, as well as main roads and roundabouts, covering an area of 6,215 square meters.