The project was implemented between 01/01/2023 and 15/02/2023.
The project benefited 4,500 people.
It involved the installation of polyethylene pipes suitable for drinking water, with a diameter of 6 inches and a length of 2,050 meters, and a diameter of 2.5 inches and a length of 1,250 meters. The project also included the installation of valves with different diameters (8 inches, 6 inches, 4 inches, 3 inches, and 2.5 inches) to control water flow in the pipes.