The project was implemented during the period between 11/6/2019 and 11/12/2019
The number of beneficiaries of the project reached 2,300 farmers.
The following was implemented
⦁ 24 engines with 24water pumps have been rehabilitated.
⦁ Replacing the 861 meters of old pipes with different diameters
⦁ Rehabilitating 11 cement water basin
⦁ clean agriculture channels, with a length of 14750 meters
⦁ Replacing a 24 pipeline with length 408 meters
⦁ Supporting engines for a period of six months with diesel and oils.